icon Add as a preferred source Download PDF version

Ziegler Feuerwehrgerätetechnik GmbH & Co. KG, based in Mühlau, Saxony, Germany, manufactured four TLF forest firefighting vehicles for the State of Thuringia, in Germany.

In the course of the year, the delivery of three additionally commissioned vehicles of the same type will also take place.

TLF forest firefighting vehicles

Overview of orders placed to date by the State of Thuringia within ZIEGLER Group:

  • 2016: 8 firefighting vehicles LF 20 KatS on MAN chassis
  • 2017: 7 firefighting vehicles LF 20 KatS on MAN chassis
  • 2021: 12 firefighting vehicles LF 20 KatS on MAN chassis
  • 2021: 7 TLF forest firefighting vehicles on Mercedes-Benz Unimog U5023
  • 2022: 22 firefighting vehicles LF 20 KatS on MAN chassis (with the option for up to 32 vehicles)

Superstructure (ALPAS) and the operating concept (Z-Control)

The loadings of all 7 TLF for the Federal State of Thuringia are also supplied by ZIEGLER

The superstructure (ALPAS) and the operating concept (Z-Control) are of the latest generation. The loadings of all 7 TLF for the Federal State of Thuringia are also supplied by ZIEGLER. Thus, everything from the chassis to the load comes from one source.

With the above procurements, the State of Thuringia invests with a foresight to help fast, when natural disasters such as forest fires or floods occur, and therefore, equipped the fire departments with additional special vehicles and equipment.

TLF forest firefighting vehicles for the State of Thuringia

Udo Götze, the State Secretary for the Interior and the Head of Office at the Thuringian Ministry of the Interior was also on-site in Mühlau for the official handover. There, he was able to see the design and performance features of the vehicles for himself.

Project Manager - Florian Patz says, “It was a constructive and great collaboration with the customer and the result is something to be proud of - Simple, user-friendly technology for extreme situations and the daily business of the fire departments.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd