icon Add as a preferred source Download PDF version

Proud to announce the completion of a project that has seen 682 solar panels installed at the new manufacturing facility in the Algarve region of Portugal.

Building a sustainable and energy-efficient manufacturing facility was one of the key prerequisites for the new plant. The Al garve is one of the sunniest places in Europe which allows us to maximize on-site solar energy generation.

On-site solar energy generation

C11 Decarbonization of Industry is a component of the RRP as it will help Portugal to achieve its goal

The 682 solar panels generate c.300KW of energy which means that 80% of the facility’s energy needs will be supplied by solar power. The on-site solar energy generation has jumped an impressive 600% compared to the former manufacturing plant.

The investment in the panels has been made under the Portuguese Recovery and Resilience Plan (RRP) which is financed by the European Union. C11 Decarbonization of Industry is a key component of the RRP as it will help Portugal to achieve its goal of becoming carbon neutral by 2050. It aims to reduce greenhouse gas emissions from the industrial sector.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd