icon Add as a preferred source Download PDF version

An Integrity test predicts how long fire suppressant agents take to descend to a given level in the room without having to release the agent itself.

When do users need an Integrity Test? When users have a gaseous suppression system installed, the protected area will need testing to ensure that the suppressant is maintained within the area and will work in case of fire.

Fire suppression retention

It is a requirement of most insurance policies and standards that their suppression system is tested at least annually. An Integrity retest is also required if any modifications are made to the area.

So moving a partition, fitting a new door, installing new cables or pipes or in any way modifying the structural perimeter of an enclosure will almost certainly affect gaseous fire suppression retention.

Any changes to the room (no matter how small or inconsequential they may seem) will require a retest carried out. KSS Engineers carry out room integrity testing to the required NFPA 2001, BS ISO 14520, and BS EN15004 methodologies.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd