icon Add as a preferred source Download PDF version

Installing fire systems at the castle in Cirencester, Gloucestershire was a £3 million pound project that was complex from the offset, and A.P.E Fire & Security had to think outside the box in respect of how these bespoke systems would operate and work with the client’s very unique requirements. The project was carried out in several different phases and in total took around 12 months to complete, utilizing a team of four engineers at different stages throughout the year.

The project involved collaboration with several high-profile designers, ultimately winning several awards and receiving a lot of press attention in the process and running as a featured article in a January 2017 edition of The Sun. This project was a perfect example of how A.P.E can work closely both clients and designers to match their unique requirements in a challenging environment.

Work completed

  • Light Grey Divider
  • Fire Alarm Installation
  • Intruder Alarm Installation
  • PC-Based Access Control
  • CCTV Systems

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd