icon Add as a preferred source Download PDF version
Summary is AI-generated, newsdesk-reviewed
  • Keyfix provides NCCT system for 31-story Leeds residential tower's fire safety.
  • Project incorporates challenging curved brickwork design for 399 apartments.
  • Keyfix supplies Class A1 non-combustible trays, enhancing safety and lifespan.

In Leeds, a new 31-storey residential tower on Skinner Street is being built with a focus on long-term fire safety. Keyfix, known for their specialized Non-combustible Cavity Tray (NCCT) system, was chosen to ensure the building complies with safety regulations, while providing quality living spaces for future residents.

The project features 399 apartments and extensive amenities, coordinated by Keady Construction, with architectural design by Leach Rhodes Walker and brickwork by Brickstone Construction.

Use in Major Residential Developments

Keyfix's NCCTs were executed, offering a solution that not only meets but exceeds vital safety norms

Having prior experience with Keyfix, Brickstone Construction recognized the company's capability to deliver non-combustible solutions suitable for large-scale residential projects.

Keyfix's NCCTs were implemented, offering a solution that not only meets but exceeds necessary safety standards and accommodates the building's unique architectural vision.

Challenging Brickwork Design

The distinctive curved facade of the building posed installation challenges for the NCCTs. Keyfix addressed this by designing bespoke trays that matched the curvature of the structure, assisting contractors in implementing a seamless fit.

In total, Keyfix provided 5,441 meters of NCCT, which included 981 Pre-Formed Corners, 13,750 Stainless Steel Weeps, and 1,365 reveal returns, ensuring consistent drainage and fire safety across the building exterior.

Keyfix's Class A1 Non-combustible Grade

These trays prevent thermal bridging and are engineered to surpass the lifespan of the building itself

Keyfix's NCCTs, made from Class A1 Non-combustible Grade 304 austenitic stainless steel, met the client's goals of creating a future-proof, high-quality construction.

These trays prevent thermal bridging and are engineered to surpass the lifespan of the building itself.

Integrated Façade Solution

Keyfix provided comprehensive support throughout the project, including timely technical assistance, regular site visits, and participation in design meetings. Their technical team played an active role by conducting toolbox talks and CPD webinars to maintain quality standards.

By meeting all technical and aesthetic demands, Keyfix successfully delivered a fully integrated façade solution that simplified installation and ensured high performance.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd