As a response to the Grenfell tragedy, Envirograf has manufactured fire-resistant panels for the purpose of constructing eco-homes and flats. As part of a large-scale fire test, Envirograf constructed an eco-house made of these prefabricated panels to demonstrate its fire resistance and integrity.

The panels are manufactured with MDF board, insulation slabs, and mastic adhesive to create a fireproof panel, suitable for use in walls or ceilings. The panels have been fire-tested, as well as airborne sound tested and thermal tested.

Eco-home infrastructure

The eco-home structure was constructed with fire-resistant panels, painted internally with HW01 coating, with electrical circuits installed for lighting and switches, and then fully furnished to replicate a traditional home.

The windows had reinforced glass panes to withstand rising temperatures.

Testing eco-home

The test ran successfully for 50 minutes and remained standing without any damage to the external face of the eco-home On Thursday 22nd July, the furnished eco-home was set alight in both the living area and bedroom, with windows remaining open to circulate air. Over the next several minutes, the smoke began to darken and thicken, burning through the furnishings and other flammable materials. Fires were compartmentalized to the room of origin and did not spread through the building.

The test ran successfully for 50 minutes and remained standing without any damage to the external face of the building. The test saw over 30 guests in attendance, who were able to witness the structural resilience of the eco home.

Open days and events

Envirograf wishes to express their thanks to everyone who came to attend the open day and are grateful for the support of the fire product innovation and fire testing.

Envirograf looks forward to seeing the public again for the future fire testing open days and events.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd