icon Add as a preferred source Download PDF version

Lithium-Ion Battery Energy Storage Systems (BESS) are required to obtain approval from the New York City Department of Buildings (NYCDOB) Office of Technical Certification and Research (OTCR) and the New York City Fire Department (FDNY). This BESS is located on a Rooftop in close proximity to three buildings and was determined to be an exposure hazard due to deflagration vents on the top of the BESS container.

Sparc prepared a performance-based design analysis and utilized computational fluid dynamics modeling (CFD) to determine the potential effects of a fire emanating from the deflagration vents. Sparc’s analysis determined that the established performance criteria of the adjacent buildings’ materials were not exceeded and the NYCDOB and FDNY accepted the proposed location of the BESS container.

In case you missed it

WAGNER's Fire Protection Solutions At BUILDINX 2025
WAGNER's Fire Protection Solutions At BUILDINX 2025

WAGNER Group GmbH will be presenting pioneering solutions for fire protection in modern logistics properties at BUILDINX 2025 in Dortmund from November 18 to 20, 2025. The foc...

Spare A Minute For Maintenance
Spare A Minute For Maintenance

With new fire safety regulations around the corner and a renewed focus on responsible persons and coordination, Karen Trigg of Allegion UK discusses the significance of fire door h...

Fire-Dex Unveils Fire Investigation PPE For Safety
Fire-Dex Unveils Fire Investigation PPE For Safety

Fire investigators have long worked in a gray area of protection where full structural turnouts are overkill, but single-layer garments may not cover every single hazard they encou...

vfd